Tag Archives: Federal Aviation Administration

Japan Airlines 787 with possible pump issue returns to Boston

A Japan Airlines flight to Tokyo’s Narita Airport returned to Boston’s Logan Airport on Thursday because of a possible fuel pump issue on the Boeing 787 aircraft.

It’s the latest trouble for the new Dreamliner aircraft after a lithium ion battery problem grounded the fleet in January and a fire erupted on an empty Ethiopian Airlines plane parked at Britain’s Heathrow Airport last week.

Flight 007 returned to Boston “as a standard precautionary measure” to check out a maintenance message indicator showing the possible fuel pump problem and landed safely, Japan Airlines spokeswoman Carol Anderson said.

The pilot didn’t declare an emergency, and the aircraft burned off fuel before landing, Federal Aviation Administration spokeswoman Arlene Salac said.

The plane left for Tokyo just before 1 p.m. Thursday for a flight of nearly 14 hours. It returned just before 6:30 p.m.

The flight was canceled, and passengers were being put on other flights.

One of two battery fires that grounded the 787s for three months broke out on a Japan Airlines plane at Logan in January after passengers had exited. The next day, another Japan Airlines 787 leaked 40 gallons of fuel at Logan. The airline said an open valve caused a tank to overflow through a vent.

The 787 is the newest and highest-profile plane from Chicago-based Boeing Co., which has said it stands behind its safety and overall integrity. The 787 is assembled at Boeing plants in Everett, Wash., and North Charleston, S.C.

…read more

Source: FULL ARTICLE at Fox US News

Key arts panel approves Eisenhower Memorial design

A powerful commission overseeing civic art and architecture in the nation’s capital voted Thursday to approve the general concept and layout of Frank Gehry’s design for a national memorial honoring Dwight D. Eisenhower.

The U.S. Commission of Fine Arts reviewed Gehry’s plans for stone or bronze statues of the 34th president, and members voted 3-1 to approve the major elements. One commissioner voted no, saying the memorial’s landscape design needed to be further developed.

The design has drawn criticism from Eisenhower’s family and others for its departure from more classical monument architecture and for the large scale of some elements.

Gehry has proposed a memorial park with statues and images of Ike as president, as World War II hero and as a young boy from Kansas. The park would be framed by large metal tapestries depicting the Kansas landscape of his boyhood home. The tapestries, in particular, would set this memorial apart from any other in Washington.

The commissioners suggested one significant change in the concept, however. They urged Gehry to remove two smaller side tapestries and instead use only one as a backdrop for the memorial park and statues.

Alex Krieger, an architect and Harvard professor, voiced support for the overall design as an urban park but asked Gehry to rethink the side tapestries because he said they defy Gehry’s attempt to convey Eisenhower’s Midwestern humility. From some angles, “the first impression is not of humility but of bigness,” he said.

Commission Vice Chairman Elizabeth Plater-Zyberk said Krieger’s suggestion would improve the overall design.

“In fact, it may be much stronger in sort of thinking of it as a park primarily with the renewed focus of the objects against the tapestries as a backdrop,” said Plater-Zyberk, an architect who is dean of the University of Miami’s School of Architecture.

Gehry said his team had considered 10 different scenarios for the tapestries and would look at them again. The idea, he said, was to relate to the buildings around the memorial, which include the U.S. Department of Education, the Federal Aviation Administration and the National Air and Space Museum, which all relate to Eisenhower’s legacy.

The arts commission is one of two panels that must approve the design in order for the $142 million project to move forward. The 14-year-old memorial project has …read more

Source: FULL ARTICLE at Fox US News

Boeing fire probe says deactivate Dreamliner beacons

British authorities probing a fire onboard a parked Boeing Dreamliner at London’s Heathrow airport recommended on Thursday that Honeywell distress beacons on all 787 planes be deactivated pending further checks.

The Air Accidents Investigation Branch said it was not clear, however, whether the fire originated in the transmitter batteries or was caused by an “external mechanism such as an electrical short”.

Nobody was hurt in the fire last Friday on an Ethiopian Airlines plane, which was empty at the time.

But the incident is a blow to US planemaker Boeing, which withdrew from service its entire fleet of Dreamliners earlier this year due to separate concerns that lithium ion batteries on board could cause fires.

A total of 68 Dreamliners have so far been delivered, and the AAIB recommends to US aviation authorities that emergency locator transmitter systems in each of them be made inert.

“It is recommended that the Federal Aviation Administration initiate action for making inert the Honeywell International RESCU406AFN fixed emergency locator transmitter system in Boeing 787 aircraft until appropriate airworthiness actions can be completed,” the report said.

It also recommended that the FAA and other regulatory authorities “conduct a safety review of installations of lithium-powered emergency locator transmitter systems in other aircraft types and, where appropriate, initiate airworthiness action”.

…read more

Source: FULL ARTICLE at Fox World News

UK investigators: Disable locator beacon on 787s

U.K. air accident investigators are recommending that all Honeywell emergency transmitters should be temporarily disabled on Boeing 787s following a fire last week at London’s Heathrow Airport.

The Air Accidents Investigation Branch said Thursday that the greatest damage to the parked Ethiopian Airlines Dreamliner occurred in the vicinity of the aircraft’s emergency locator transmitter.

Investigators said it was not clear if the fire was caused by the transmitter’s batteries or a short near or around the transmitter, but recommended that the Federal Aviation Administration disable Honeywell’s transmitters in Boeing 787s “until appropriate airworthiness actions” can be carried out.

Investigators also recommended that the FAA and other regulators carry out a safety review of lithium-battery powered transmitters in other types of aircrafts.

…read more

Source: FULL ARTICLE at Fox World News

Investigation under way into 787 Dreamliner fire

A British governmental body is leading the investigation into a fire aboard an empty Dreamliner aircraft at Heathrow Airport, an incident that has sparked renewed concern about Boeing’s newest plane.

The Air Accidents Investigation Branch, part of the Department of Transport, says the Ethiopian Airlines 787 plane was moved to a secure hangar at Heathrow early Saturday so that the investigative team can try to find out what caused Friday’s fire.

It did not cause any injuries because no one was aboard the plane, but the fire forced runways at Heathrow to shut down for nearly an hour as emergency crews attended.

Others also involved in the investigation include the U.S. National Transportation Safety Board and the Federal Aviation Administration, Boeing, and Ethiopian Airlines.

…read more

Source: FULL ARTICLE at Fox World News

Investigators Begin Looking into Boeing Dreamliner Fire

By Reuters

ethiopian airlines boeing 787 dreamliner fire heathrow airport batteries technology

Filed under: , , , ,

AP

By Estelle Shirbon

LONDON — Investigators started work Saturday to establish the cause of a fire on a Boeing Dreamliner at London’s Heathrow airport, a new setback for the high-tech model after it was grounded at the start of the year over battery problems.

The fire broke out on the plane, operated by Ethiopian Airlines, Friday afternoon, when it was parked at a remote stand with no passengers on board, eight hours after arriving from Addis Ababa. No one was injured.

External scorching could be seen close to the plane’s tail, in a different area from the bays containing batteries. There was no official indication of what could have caused the fire.

“The aircraft has been moved to a secure hangar at Heathrow and the investigation has begun,” said a spokesman for Britain’s Air Accidents Investigation Branch.

The AAIB will lead the investigation, he said, working alongside the U.S. Federal Aviation Administration and National Transportation Safety Board, Ethiopian Airlines and Boeing.

Analysts say Boeing (BA) will be keen to reassure airlines, travelers and investors over the cause of the fire as quickly as possible but it will be up to investigators to decide how much information to release and when. Under aviation rules there are restrictions on how much companies can say about the details of an ongoing accident investigation.

Meanwhile Ethiopian Airlines, one of Africa’s top five carriers, said it would continue to fly its Dreamliner fleet.

“We have not grounded any of our aircraft,” the carrier said in an emailed statement Saturday. “The incident at Heathrow happened while the plane was on the ground and had been for more than eight hours and was not related to flight safety.”

Separately, engineers from Britain’s Thomson Airways were inspecting their own Boeing Dreamliner after it had to turn back during a flight Friday from Manchester in England to Sanford, Fla., because of an unspecified technical issue. Thomson Airways is one of six European airlines owned by TUI Travel, the world’s largest tour operator.

Battery Problems

The two incidents are a blow for Boeing particularly as the entire global fleet of Dreamliners had to be grounded for three months, ending in April, after one high-tech battery caught fire and another overheated.

Boeing shares closed down 4.7 percent at $101.87 Friday, knocking $3.8 billion off the company’s market capitalization.

Quoting Mark Mangooni, Ethiopian Airlines’ senior manager in Britain, the Financial Times reported that airline staff had discovered a problem with the aircraft’s air conditioning system during a routine inspection and had seen sparks but no flames.

The report didn’t make clear when this had happened. Reuters couldn’t reach Mangooni for comment.

Heathrow briefly closed both its runways to deal with the fire, and a spokeswoman said Saturday that the airport …read more

Source: FULL ARTICLE at DailyFinance

Boeing 787 Dreamliner takes flight in Japan for first time since battery fire

Japan‘s All Nippon Airways has successfully conducted its first test flight of the Boeing 787 aircraft since battery problems grounded the planes earlier this year.

Ray Conner, president of Boeing’s consumer airline division, and ANA President Shinichiro Ito were aboard the flight Sunday.

The aircraft safely completed a two-hour flight before returning to Tokyo’s Haneda Airport.

Batteries aboard two 787s failed less than two weeks apart in January, causing a fire aboard one plane and smoke in another. The root cause of those problems is still unknown.

Boeing has since developed and tested a revamped version of the battery system, with changes designed to prevent and contain a fire.

Japan‘s transport ministry approved Boeing’s modifications Friday following similar steps by the U.S. Federal Aviation Administration.

Source: FULL ARTICLE at Fox World News

B787 1st test flight in Japan since battery fire

Japan‘s All Nippon Airways has successfully conducted its first test flight of the Boeing 787 aircraft since battery problems grounded the planes earlier this year.

Ray Conner, president of Boeing’s consumer airline division, and ANA President Shinichiro Ito were aboard the flight Sunday.

The aircraft safely completed a two-hour flight before returning to Tokyo’s Haneda Airport.

Batteries aboard two 787s failed less than two weeks apart in January, causing a fire aboard one plane and smoke in another. The root cause of those problems is still unknown.

Boeing has since developed and tested a revamped version of the battery system, with changes designed to prevent and contain a fire.

Japan‘s transport ministry approved Boeing’s modifications Friday following similar steps by the U.S. Federal Aviation Administration.

Source: FULL ARTICLE at Fox World News

Ethiopia flies first Dreamliner since grounding

A Boeing 787 operated by Ethiopian Airlines flew from Ethiopia to Kenya‘s capital Saturday, the first commercial flight since air safety authorities grounded the Dreamliners after incidents with smoldering batteries on two different planes in January.

The Boeing 787 passenger jet arrived in Nairobi on Saturday afternoon after a two-hour trip from Ethiopia‘s capital, Addis Ababa, according to the Kenya airport website. The Dreamliner arrived at Nairobi’s Jomo Kenyatta International Airport at 12:40 p.m. local time, according to the Kenya Airports Authority.

The U.S. Federal Aviation Administration has approved Boeing’s redesigned battery system, which the company says sharply reduces the risk of fire.

Richard J. Horigan, a Boeing engineer, told reporters in Nairobi this week that all potential causes of battery fire have been eliminated with the new system. But he noted that the root cause of smoldering batteries experienced by the two different 787s may never be known because the evidence was destroyed by heat.

“We would like to thank Ethiopian Airlines for the patience, support and leadership shown throughout the period that the 787 Dreamliner has been grounded,” Boeing Commercial Airplanes President Ray Conner said in a news release.

There are 50 Dreamliners in service around the world. Once the FAA approves the fix on individual planes, airlines can start flying them again. United Airlines, the only U.S. airline with the planes, moved one of its six 787s to a Boeing facility in San Antonio, Texas, on Tuesday so it can get the battery fixed. Neither of the battery incidents involved a United jet.

Boeing said Wednesday that deliveries of the 787 should resume in early May.

Source: FULL ARTICLE at Fox World News

787 Dreamliner flies to Kenya from Ethiopia

An official with Ethiopian Airlines says one of the company’s Dreamliners is scheduled to fly from Ethiopia to Kenya‘s capital, the first commercial flight since air safety authorities grounded the passenger jets after incidents with smoldering batteries on two different planes in January.

The Boeing 787 passenger jet was scheduled to arrive in Nairobi from Addis Ababa on Saturday afternoon.

The U.S. Federal Aviation Administration has approved Boeing’s redesigned battery system, which the company says sharply reduces the risk of fire.

A Boeing engineer told reporters in Nairobi this week that all potential causes of battery fire have been eliminated with the new system.

There are 50 Dreamliners in service around the world. Boeing said Wednesday that deliveries of the 787 should resume in early May.

Source: FULL ARTICLE at Fox World News

Delays Hit U.S. Airports As Furloughs Kick In, FAA Says

By Reuters

Filed under: , , , ,

David Goldman/AP

By Alwyn Scott

NEW YORK — Travelers waited more than an hour for flights in New York and experienced delays at other U.S. airports on Sunday evening as furloughs of air traffic controllers began, reducing the ability of busy hubs to handle arrivals and departures, the Federal Aviation Administration said.

The furloughs that started Sunday reduced staffing by 10 percent across the country. Last week, the FAA warned of delays up to 3½ hours at some airports as the agency cuts spending to meet reductions required under federal budget cuts.

New York‘s LaGuardia and John F. Kennedy airports reported delays of more than an hour, and Philadelphia international airport also reported delays due to furloughs, the FAA said.

Los Angeles International reported nearly a 2-hour delay at 10 p.m. ET, and Newark Liberty International reported 28-minute delays, though the FAA couldn’t confirm whether those were related to the staff cuts. Delays of up to 58 minutes in San Francisco and 29 minutes in Orlando, Fla., were due to construction and weather, the FAA said.

“Relatively good weather throughout the country and light traffic helped minimize air traffic delays,” FAA spokeswoman Laura Brown said.

Sponsored Linksadsonar_placementId=1505951;adsonar_pid=1990767;adsonar_ps=-1;adsonar_zw=242;adsonar_zh=252;adsonar_jv=’ads.tw.adsonar.com’;

The delays come as the FAA furloughs its 47,000 employees, including nearly 13,000 air traffic controllers who manage the nation’s airspace.

The furloughs are set to last through September, the end of the U.S. fiscal year, and are expected to save about $200 million of the $637 million the agency must cut from its $16 billion budget, the FAA said last week.

Paul Rinaldi, president of the Air Traffic Controllers Association, said about 1,200 to 1,500 controllers will be staying home each day, on average, and that some airports might be able to shift staffing to reduce the effect of the furloughs. U.S. airports handle about 25,000 flights a day, he said.

%Gallery-179846%

Permalink | Email this | Linking Blogs | Comments

From: http://www.dailyfinance.com/2013/04/22/faa-furloughs-airport-delays/

Boeing's Dreamliner Could Resume Flights Next Month

By The Associated Press

Filed under: , , , ,

Joshua Trujillo, seattlepi.com/AP

WASHINGTON — Published reports say Boeing’s grounded 787 jetliners could soon be flying again.

The Wall Street Journal reports that the Federal Aviation Administration is set to approve Boeing’s fix for the ion-lithium batteries. The 787 Dreamliner has been grounded since mid-January because of smoldering batteries that in one case caused a serious fire.

The Journal says the FAA is expected to announce Friday that Boeing’s redesigned batteries are safe. The fix includes more heat insulation and a battery box designed to vent any hot gases from the batteries outside the planes.

There was no immediate comment from the FAA and a Boeing Co. (BA) spokesman declined to comment on the report.

The New York Times, which also reported the development, says the aircraft could be back in service next month.

%Gallery-185227%

Permalink | Email this | Linking Blogs | Comments

From: http://www.dailyfinance.com/2013/04/19/boeing-787-dreamliner-resume-flights-may/

American Airlines reservations system down, flights grounded nationwide

American Airlines flights across the country are grounded because of computer problems.

American asked the Federal Aviation Administration to halt its flights until 5 p.m. EDT. Flights on regional affiliate American Eagle heading to Dallas, Chicago or New York’s LaGuardia Airport have been stopped until 3:30 p.m. EDT.

Some passengers are stuck on planes while others can’t make reservations.

Passengers are using social media to flood the airline with complaints.

American Airlines spokesman Kent Powell said Tuesday that the airline is trying to resolve the issues as quickly as it can.

On Twitter, American is sending out apologies but not offering customers much information about when the problem will be fixed.

From: http://feeds.foxnews.com/~r/foxnews/national/~3/4s1C4lVHAKk/

Pilot's texting contributed to fatal copter crash, NTSB says

Texting by the pilot of a medical helicopter contributed to a crash that killed four people, federal accident investigators declared Tuesday, and they approved a safety alert cautioning all pilots against using cellphones or other distracting devices during critical operations.

It was the first fatal commercial aircraft accident investigated by the National Transportation Safety Board in which texting has been implicated. And it underscored the board’s worries that distractions from electronic devices are a growing factor in incidents across all modes of transportation — planes, trains, cars, trucks and even ships.

The five-member board unanimously agreed that the helicopter crash was caused by a distracted and tired pilot who skipped preflight safety checks, which would have revealed his helicopter was low on fuel, and then, after he discovered his situation, decided to proceed with the fatal last leg of the flight.

The case “juxtaposes old issues of pilot decision making with a 21st century twist: distractions from portable electronic devices,” said board Chairman Deborah Hersman.

The helicopter ran out of fuel, crashing into a farm field in clear weather early on the evening of Aug. 26, 2011, near Mosby, Mo., a little over a mile short of an airport. The pilot was killed, along with a patient being taken from one hospital to another, a flight nurse and a flight paramedic.

One board member, Earl Weener, dissented on the safety alert decision, saying the cases cited as the basis for it — including the medical helicopter accident — were the result of bad decisions by pilots without a direct connection to the use of distracting devices.

Other board members disagreed. “We see this as a problem that is emerging, and on that basis, let’s try to get ahead of it,” said board member Chris Hart.

The pilot, James Freudenberg, 34, of Rapid City, S.D., sent 25 text messages and received 60 more during the course of his 12-hour shift, including 20 messages exchanged during the hour and 41 minutes before the crash, according to investigators and a timeline prepared for the board.

Most of the messaging was with an off-duty female co-worker with whom Freudenberg had a long history of “frequent, intensive communications,” and with whom he was planning to have dinner that night, said Bill Bramble, an NTSB expert on pilot psychology.

Three of the messages were sent, and five were received while the helicopter was in flight, although none in the final 11 minutes before it crashed, according to the NTSB timeline.

The helicopter was operated by a subsidiary of Air Methods Corp. of Englewood, Colo., the largest provider of air medical emergency transport services in the U.S. The company’s policies prohibit the use of electronic devices by pilots during flight.

In January, the Federal Aviation Administration proposed regulations prohibiting airline flight crews from using cellphones and other wireless devices while a plane is in operation. The regulations are required by a law passed by Congress last year. Regulations already in place prohibit airline pilots from engaging in potentially distracting activities during critical phases of flight such as takeoffs, …read more

Source: FULL ARTICLE at Fox US News

Gov't: 4 NY area airports have training violations

The federal government has cracked down on four New York City area airports for what it calls “egregious” violations of safety and rescue regulations involving more than 250 police officers.

The Port Authority of New York and New Jersey oversees Kennedy, LaGuardia, Newark Liberty and Teterboro (TEE’-tur-bur-oh) airports. The agency confirmed Monday it was fined more than $3 million for violations going back to 2010.

Spokeswoman Lisa MacSpadden says the Port Authority officers linked to the violations attended recertification sessions. But she says some of the paperwork that proves it was lost or incomplete. She says an undetermined number of officers may have missed hours.

U.S. Transportation Secretary Ray LaHood says violations won’t be tolerated.

The agency is working with the Federal Aviation Administration to rectify the lapses.

…read more

Source: FULL ARTICLE at Fox US News